Not happening, solar, batteries, wind, geothermal, and other renewables have a lead that cant be taken with wild hype and mumble logic.
Hard work, and lots of it is the only hope for an American renaissance.
I was prepared to be dissapointed, but I am not.
Honest, simple, carrys that sense of work is good and doing what needs to be done is enough and that you are just another critter.
Some people write/speak in sentences, others in paragraphs, some fewer number can spin off a cohearant chapter, and the very occasional creature will discource at book length.
Which is my way of saying, thanks!
more, MORE, MORE, security, and monitoring, and SAFTEY, MORE SAFTEY NOW, who do I have to kill to get more SAFTEY, GIVE SAFTEY, with gun drones, and cameras up the ass, super supository saftey pro
THINK OF THE CHILDREN!
That made me laugh. I have never used AI, dont care if it works, and am (negativly) indiferent to it.
Long ago I set benchmarks for algorithms that would indicate that they were sophisticated enough for general drudge work, for which they remain utterly inadequate.
That they can fulfill formulaic tasks is hardly surprising, though the compute required does seem to be a lot.
further disincentives to having more than 2 kids.
further inceitive for rich people to buy bigger cars, as they will be bigger status symbols for those with the write offs.
militarily this is called a disorganized retreat.while not a full rout, it definitly points to a lack of planning, but with a general excess of capacity in certain area's, like air lift, the whole thing bieng run like a classic mob operation where the boss is literaly standing up saying "tell me what I want to hear!"
transformers are infrastructure, 100% duty cycle with a significant overload capacity that can be 3 times name plate, right there with dams and bridges, and if one developes a fault, realy bad things happen and you get a crater.
There very nature makes them imensely heavy and very compact, all of the equipment used to form the parts is gargantuan, and materials to build them come in units that must be moved by house sized forklifts, consider changing a tire on such a forklift.
Remember that the largest transformers travel on the heaviest rail cars, specials, these things are way heavier than anything else per ft³.
Which gets us to cold,warm, or hot idle, or decomisioning, which are your choices when a huge factory has no work, hot idle means limited production, warm means some of the guys hang out and tinker with stuff, cold means, locked up,no employees but security, as decomisioning something like this has strategic considerations, or should.
reply